COST OF ECD WASTE MANAGEMENT
The financial contributions of the liable waste producer / holder to the CSAM for the processing operations are structured as follows:
Α/Α | Categories of E C&D Waste | Classification of European Waste Catalogue (EWC) | Further Analyze with the including EWC | Contribution of the Obligor
[€/tn] |
Description |
1 | Asphalt abrasion Waste | 17 03 02 | 1.33 | bituminous mixtures containing other than those mentioned in 17 03 01 |
|
Unreinforced Concrete waste | 17 01 01 | Concrete1 | |||
1-Α | Excavation Waste (Soil – exclusively of Sandy Composition) |
17 05 04 | 1.20 | Sand (clean) | |
1-Δ | Concrete production waste (optional) | 10 13 14 | 1.33 | waste concrete and concrete sludge | |
2 | Waste from removals (Mixed Stream of Waste) | 17 09 04 | 170101/ 170302/ 170405/ 170504/ 170506 | 3.02 | Slightly reinforced concrete (mesh), asphalt, soil, stones, gravel |
Excavation waste (Earthy / Semi-rocky) | (*) 17 05 04
(*)17 05 06 |
Excavation waste & boulders / Excavation waste (dredging materials & boulders) | |||
3 | Demolition Waste (Free of impurities) | 17 01 01
17 01 02 17 01 03 17 02 01 17 01 07 |
7.54 | Heavy reinforced concrete, concrete of special shape and high mechanical strength, Bricks, tiles and ceramics, wood,
Mix of concrete, bricks, ceramics, wood |
|
17 09 04 | 170101/ 170405/ 170504 /170506 | ||||
4 | Demolition - Restoration Waste (with significant percentage of impurities) | 17 09 04 | 170107 /170201/ 170202/ 170203/
170802/170504/ 170506/170402/ 170405 |
12.89 | Concrete, bricks, ceramics, metals, wood, glass, sand, gypsum |
5 | Waste from Construction and Renovation | 17 09 04 | 170102/ 170103/ 170107/ 170201/ 170202/ 170504/ 170802/ 170604 | 29.55 | Bricks, ceramics, wood, glass, metals, plastic, sand, gypsum |
6 | In situ managed waste | 17 05 04
17 03 02 17 01 01 17 01 07 |
0.20 | soil and stones, bituminous mixtures, concrete, mixtures of concrete, bricks, tiles and ceramics | |
7 | Metals Waste | 17 04 01 | 0.40 | copper, bronze, brass | |
17 04 02 | aluminium | ||||
17 04 03 | lead | ||||
17 04 04 | zinc | ||||
17 04 05 | iron and steel | ||||
17 04 06 | tin | ||||
17 04 07 | Mixed metals | ||||
17 04 11 | Cables other than those mentioned in 17 04 10 |
(*) after the agreement of the Recycling unit the fee may be set at 1.33 €/tn as stream 1.
1 The category does not include concrete items of special shape and high mechanical strength, such as blocks for ports, tunnel segments, etc.
The financial contribution of the liable producers / holders to the Collective System for Alternative Management of ECD Waste for the disposal - utilization operations for the restoration of quarries, in accordance with article 40 of Law 4030/2011 as in force, is as follows:
TYPE OF UTILISATION | Categories of C&D Waste | CORRELATION WITH EWC | Contribution of the Obligor [€/tn] |
Description |
Quarry Restoration | Excavation waste (Earthy / Semi-rocky) | 17 05 04 | 1.33 | Soil / Stones |